12 MWh Manzanares Battery Storage Equipment Supply

   2025-07-18 0
核心提示:Tender Notice for the BESS Manzanares Supply (Tend

Tender Notice for the BESS Manzanares Supply

(Tender No. IA2025210000007、SPROC2025071500000002)

1. Tender Conditions

China Three Gorges Spain S.L.U. is planning to install a 6MW*2h Battery Energy Storage System (BESS) at its exiting Manzanares Solar PV plant in Spain. The Scope of this Request for Proposal (RFP) is the equipment supply for the BESS Manzanares and now is open for public bidding.

Tenderee: China Three Gorges Spain S.L.U. (CTGS).

Tendering Agent: China Three Gorges International Tendering Co., Ltd.

Project Funds: Tenderee’s own funds.

Procurement Method: International Open Competitive Bidding.

*Important Note: Bidder only has one chance to submit the proposal, and all the materials shall be prepared and submitted as per the RFP requirements.

2. Project Overview and Tender Scope

2.1 Project Overview

The individual Manzanares Solar PV power plants Azuer I PV plant and Azuer II PV plant are located in Ciudad Real, a province in Spain, with installed capacities of 49.89 MWp and 39.09 MWp, respectively. They share a common step-up substation and grid connection point, with a total grid access capacity of 75 MW. The PV plants were commissioned and began generating electricity in late December 2021.

The step-up substation includes a reserved switchgear bay. The proposed site for installing the energy storage system is flat and adjacent to the substation, offering optimal conditions for deployment of battery energy storage facility. The energy storage system will be connected via a medium-voltage underground cable to the existing SET AZUER 220/30 kV substation, shared with the Azuer I solar PV plant. Additionally, the Azuer II PV plant also injects power through this substation. The SET AZUER substation connects to the Manzanares 220 kV A.I.E. collector substation (solar hub), located approximately 20 km away, via a 220 kV transmission line. From there, it links to the Spanish national grid (REE) via an existing 220 kV overhead line, terminating at the Manzanares 220 kV substation, which serves as the final Point of Interconnection (POI) to the grid.

The complete scope of work for the whole energy storage system includes system design and equipment supply, civil works, construction of internal and external access roads, fencing installation, electrical interconnections, communication and control interfaces, and installation of all required auxiliary systems, etc.

CTGS places significant importance on hybridizing BESS with the existing Manzanares Solar PV plants to conduct research on its asset value improvement and how to maximize the company’s return on investment. For the first step, CTGS will conduct a 6MW*2h BESS hybridized with Azure I PV plant as a pilot and scientific Research and Development (R&D) project to understand the key technologies, operations and income mechanism of energy storage plants in Spain. The key research points for this R&D project include: implementation of BESS demonstration project, economic analysis of hybridized BESS with PV plant, key technologies and testing & commissioning of BESS, and BESS connection with grid and its operation, etc.

This RFP focuses on the BESS equipment supply and requires the bidders (integrators) to optimize the installed power and energy capacity to comply with the following reference requirements:

Parameter

Requirements

Installed Power (MW)

6 MW

Total Energy Capacity (MWh)

12 MWh

Usable Energy (MWh) at POI at BOL

Minimum – 10,6 MWh

Usable Energy (MWh) at POI at year 20

Minimum – 6,3 MWh

RTE (BOL) at POI (%)

>85%

RTE (at year 20) at POI (%)

>83%

Availability

≥98% including scheduled and unscheduled outages

Auxiliary consumption

<2% of the Usable Energy

DoD range

100%

Average cycling/day

1,5 equivalent cycles/day

Charge/Discharge Method

CP/CP

2.2 Tender Scope

The scope of works for the BESS Manzanares equipment supply shall at least include the following and other relevant necessary works:

  1. Design, sizing and engineering of the BESS
  2. BESS Main Equipment Supply
  3. Spare Parts, consumables and Special Tools
  4. Factory Acceptance Test
  5. Transport (DDP, Incoterms 2020)
  6. Installation supervision
  7. Commissioning
  8. Product warranties
  9. Performance guarantees (capacity, power and availability)
  10. Maintenance under a Long Term Serves Agreement (LTSA)
  11. Provision of R&D assistance, including technical support, guidance, and Q&A (relevant research areas include key grid access technologies for BESS in the Spanish power system, dispatching and operational strategies for photovoltaic and energy storage power plants, and critical commissioning technologies for energy storage facilities).

The following works shall not be included in the BESS Manzanares equipment supply scope:

  • Preparatory works
  • Infrastructure works and construction facilities
  • Grid connection
  • Civil works
  • Electrical equipment interconnections
  • Instrumentation and control (I&C) interconnections
  • Security system

The bidder's quotation or technical proposal shall also include a detailed testing and commissioning plan, specifying the proposed duration, team members, and relevant resources to be mobilized.

The detailed requirements and references can be found in the annexes. Please refer to the table below for the corresponding annex numbers and their contents:

Annex

Content

0

Supplier Registration, Tender (Quotation) Operation Manual

1

Instructions, Description and Preliminary Design of the Project

2

Minimum Functional Specification

3

Inspection & Tests on Completion and PAC

4

BESS Manzanares Supply Contract DRAFT (together with Appendix in Annex 4.1-4.5)

Annex 4.1 Appendix III Advance Payment bond

Annex 4.2 Appendix III Performance bond

Annex 4.3 Appendix III Warranty bond

Annex 4.4 Appendix IV Lien Waiver

Annex 4.5 Appendix V HSE OM Management Manual template

5

LTSA Specifications

6

Format of Bid Documents (together with some templates and format requirements in Annex 6.1 - 6.5)

Annex 6.1 Price Breakdown Sheet

Annex 6.2 Technical Datasheets

Annex 6.3 Project Planning and the Main Milestones

Annex 6.4 Compliance Commitment Letter

Annex 6.5 Bid Submission Checklist

3. Qualification Requirements

3.1 Qualification Conditions of Bidders

Bidders shall meet the following qualification conditions:

(1) Financial requirement: the bidder shall be in good financial condition (provide the financial statements for 2021, 2022, and 2023).

(2) Performance requirements (refer to the bidder or its parent company):

A. From 1 January 2017 to the bid Submission Deadline, the bidder or its parent company shall have BESS project-related experience and equipment supply ability, and shall have successfully implemented no fewer than six (6) BESS projects globally (either completed or under construction, and at least including the battery room/container and the power conversion and step-up system); AND

B. From 1 January 2022 to the Bidding Submission Deadline, the bidder or its parent company shall at least have three (3) BESS projects experience with each installed capacity over 10MWh successfully constructed and operating (based on the BESS project commissioning date and at least including the battery room/container and the power conversion and step-up system); OR from 1 January 2020 to the Bidding Submission Deadline, the bidder or its parent company shall have cumulatively completed BESS projects with a total capacity exceeding 50?MWh (based on the BESS project commissioning date and at least including the battery room/container and the power conversion and step-up system).

(3) Local presence requirement

The bidder must maintain a sufficient local presence to support the BESS business in Spain (shall provide relevant documents demonstrating its local capabilities):

  • Availability of spare parts warehouse located in Spain or in neighboring countries to ensure that transportation time from the warehouse to the site can be within 10 calendar days; AND
  • Local team in Spain should include professionals holding experience or certifications at least covering Battery, PCS, EMS, Commissioning and Maintenance.

4. Acquisition of Tender Documents

The tender documents will be published at 12:00 p.m. on July 16, 2025 (Local Spanish time, hereinafter referred to as CET). (the same as below).

The tender documents are only available in electronic form and are free of charge.

Potential bidders must complete registration through the China Three Gorges International ERP system on the ARIBA platform (http://CTGI.sourcing-eu.ariba.com/ad/selfRegistration),.The bidder will send the electronic bid documents to the ARIBA platform after the registration.

Bidders shall log into the ARIBA platform (https://service.ariba.com/) to download the tender documents. The ARIBA Platform User Manual for bidders is provided as an attachment to the tender documents (please refer to the Annex 0 for the user manual).

5. Submission of Bid Documents

The deadline for submission of bid documents (Bidding Submission Deadline, the same below) is August 18, 2025, at 12:00 p.m. CET.

The submission of bid documents shall be made online and bid documents shall be successfully submitted to ARIBA before the Bidding Submission Deadline. The tenderee shall not accept the bid documents submitted after the Bidding Submission Deadline.

6. Bid Opening Time

Bid Opening Time: same as the Bidding Submission Deadline.

7. Media for Bidding Announcements

The tender notice is officially published on the SAP Ariba platform (https://service.ariba.com/), China Three Gorges Europe's LinkedIn page (https://www.linkedin.com/company/china-three-gorges-europe-s-a/), and China Three Gorges Electronic Procurement Platform (https://eps.ctg.com.cn).

8. Contact Details

Tenderee: China Three Gorges Spain S.L.U.

Address: 112 Príncipe de Vergara Street, 6th Floor, 28002 Madrid, Spain

Contact: Mrs. Shi

E-mail: shi_yuexueyan@ctgeu.com

Tender Agency: Beijing Project Department of China Three Gorges International Tendering Co. Ltd.

Address: 8/F, Building 5, Chengda Center, No.2 Courtyard, Grain Market Street, Tongzhou District, Beijing, China

Contact: Mr. Wu

E-mail: wu_yuqi@ctg.com.cn

編輯:eps.ctg.com
 
異議收藏 0打賞 0
 
更多>同類招標會員區
  • dlztb008
    加關注12
  • 沒有留下簽名~~
推薦圖文
最新招標招標會員區
國家能源招標會員區
網站首頁  |  密碼索回  |  服務說明  |  入網協議  |  銀行匯款  |  聯系方式  |  關于我們  |  用戶協議  |  隱私政策  |  版權聲明  |  網站地圖  |  排名推廣  |  網站留言  |  京ICP備12017752號-8  |  11010702002406號
 
主站蜘蛛池模板: 青青青在线手机免费观看播放 | 国产精品一区二区在线观看 | 久久亚洲这里只有精品18 | 青青草精品在线视频 | 欧美日韩视频精品一区二区 | 国内精品久久久久久久亚洲 | 国产亚洲一欧美一区二区三区 | 万界仙踪全集免费观看 | 国产不卡影院 | 久久精品综合 | 国产馆精品推荐在线观看 | 兰闺喜事电视剧免费观看完整版 | 青青草精品在线 | 国产精品三级国语在线看 | 亚洲综合日本 | 人人干人人爽 | youjizzcom中国| 亚洲精品午夜久久久久久app | 日韩高清在线播放不卡 | 91国色 | 国产成人在线播放 | 久久亚洲精品成人综合 | 最近最新中文字幕大全手机在线 | 国产成人aa视频在线观看 | 成人在线免费视频 | 久久国产精品无码网站 | 日本在线国产 | 嫩草影院国产 | 蜜桃视频一日韩欧美专区 | 青草视频在线观看视频 | 国产精品 视频一区 二区三区 | 京剧猫第一季 | 亚洲精品tv| 亚洲午夜久久久精品影院 | 在线观看一区二区三区视频 | 腐漫画下载 | 久久九九亚洲精品 | 小草影院免费观看视频 | 一区二区不卡在线观看 | 日韩专区一区 | 日韩精品欧美国产精品亚 |